INTRODUCTION
Figure 25.1 illustrates the overall protection scheme in a generating station. The auxiliary equipment inside the plant requires 5 to 10 percent of the power generated. The remainder goes to the grid. Since the plant is closely interconnected, a single failure requires more than the electrical and mechanical disconnection of the faulted system. This chapter covers the following topics:
1. The main unit protection. It includes the electrical protection of the plant equipment for which faults result in the tripping of one of the main plant systems.
2. The methods used to initiate the tripping of other associated plant systems.
Related posts:
PERMANENT SPLIT-CAPACITOR MOTOR - SHADED-POLE MOTOR (Motor Starting Methods)
Audio Ampliļ¬ers:Slew Rate Limiting
OBJECTIVE TESTS ON D.C. GENERATORS.
AUDIO ELECTRONICS:CLOSED-CIRCUIT TV
HOW MICROCOMPUTERS WORK:COMPUTER ORGANIZATION AND OPERATION
Stepping Motors:Windings
Noise and Grounding:Mechanical Layout and Design Considerations
The Capacitor-Start Motor
AC SINE WAVE VOLTAGE AND CURRENT VALUES
Computations and circle diagrams:Starting of Slip-ring Motors
AUDIO AND VIDEO SYSTEMS – AUDIO SYSTEMS
CONTROL FUNDAMENTALS:STEP CONTROL
Engine Valve System part12
Earthing and Bonding:Equipotential Bonding