Service diagnosis and repairs:Mechanical failure or partial loss of thermal charge

Mechanical failure or partial loss of thermal charge

If the valve is seized in a closed position the procedure will be the same as previously described.

When a valve is letting by or has lost part of its thermal charge, then the system must be pumped down before carrying out the procedure.

Pressure drop

If an internal equalizing expansion valve is substituted with an external equalizing valve, an additional connection must be provided for the external equalizing capillary.

Refrigeration Equipment 7-31-42 PM

The capillary connection must be installed in the suction line as illustrated in Figure 24. The connection is a 1 in flare half union, brazed into the suction line 150 to 200 mm downstream from the expansion valve bulb location.

Replacing the filter drier

Assuming the restriction in the drier is only partial, and that a low pressure cut-out control is in circuit, the following procedure should be adopted:

1 Note the pressure at which the compressor cuts out. The control must be reset to the original setting after the filter drier is replaced.

2 Alter the range of the low pressure control and pump down the system as previously described. Ensure that the suction service valve is front seated when this is completed.

3 Isolate the plant electrically.

4 Remove the defective filter drier and replace it. Take care that the new one is installed correctly; note the direction of flow.

5 Open the liquid shut-off valve at the receiver.

6 Leak test the joints which have been disturbed.

7 Loosen the connection on the suction line at the inlet to the compressor and allow a small amount of vapour to escape, tighten connection.

8 Set the suction service valve to the operating position and operate the plant.

9 Reset the low pressure control to its original cut-out setting.

10 Remove gauges, fit service valve caps and carry out a final leak test.

11 Clear the site of debris etc.

Should the filter drier be completely blocked, which is improbable, then the replacement procedure will be the same as that given earlier for the replace- ment of a thermostatic expansion valve with a complete loss of charge.

The filter drier is described further in Chapter 12.

Low side purging

Low side purging is now considered to be bad practice and air in the system should be removed by using a vacuum pump to minimize refigerant loss to the atmosphere which in turn affects the ozone layer. The correct procedure to be adopted is given in the section dealing with reclaim and recovery of refrigerants.