Purging hoses and manifold
Having fitted the gauges to the service valves, the next step is to remove any air from the hoses and manifold. Air contains moisture and is a contaminant, and its entry to the system must be prevented.
Once the gauges have been fitted, proceed as follows:
1 Crack off the discharge service valve (turn the valve stem one turn clock- wise).
2 Open both shut-off valves on the manifold.
3 Loosen the hose connection (blue) on the suction service valve and allow the pressure to leak out slowly for one or two seconds.
4 Tighten the hose connection.
5 Close both shut-off valves on the manifold.
6 Crack off the suction service valve.
Related posts:
Other Automatic Controls:Fan Manager
Gas and Oil Controls:Direct-Spark Ignition Module
REFRIGERANTS:REFRIGERANT PROPERTIES
Furnace Fundamentals:Pipeless Floor and Wall Furnaces.
Operating principles and symptoms:Compressor pressure ratio and Symptoms of system faults
Boiler and Furnace Conversion:Starting a Conversion Gas Burner (Pilotless)
Boiler and Furnace Conversion:Installing a Conversion Gas Burner
HEATING CIRCUITS:HEAT PUMPS
Phase Equilibrium in Mixtures:A Simple Model for Heat of Mixing and Activity