Regenerative or Hopkinson’s Test (Back-to-Back Test) By this method, full-load test can be carried out on two shunt machines, preferably identical ones, without wasting their outputs. The two machines are mechanically coupled and are so adjusted electrically that one of them runs as a motor and the other as a generator. The mechanical output of […]
Continue reading…